In the latest version of MiTS 2 (starts from 2.4.8.0), all long sections and cross section are now available for ‘customize the indication of levels’.
This level of customization is applicable for X-interval and Y-interval.
The levels can be edited at the project parameters and it is per module basis.
Earthwork – Cut section #
For example, X Detail Interval Level is 20m and Elevation Detail Interval Level is 4m.
Road – Cross section #
For example, Offset Distance is 10m and Elevation Interval is 5m.
Drainage – Long section #
For example please refer Drainage’s user manual here
Water reticulation – Long section #
For example please refer Water Reticulation’s user manual here
Sewerage – Long section #
For example please refer Sewerage’s user manual here