603 - 5885 1250 (4 lines) info@mes100.com

Carriageway, Shoulder and Verge Gradient

In MiTS 2

Existing Road #

To change the gradient of carriageway, shoulder and verge of existing road, go to:

Carriageway #

Super-elevation > Spread Input > Adjust Cross Slope Rate % value

image1

Shoulder #

Road Width > Properties tab on RHS > Adjust Shoulder Cross Slope,% value  

image6

Verge #

Options > Project Parameters > Road > Analysis > Design > Verge Slope, % (Adjust  

the value)

* Verge slope gradient is calculated independently if “Verge & shoulder Slope Independent” is ticked. If it is unticked, verge slope is calculated cumulatively from shoulder slope. Calculation of the gradient can be referred in the spreadsheet. Click Here.

image2

New Road #

All values set in the Parameter will be applied towards new road design.

Powered by BetterDocs

× WhatsApp Help