Customizing X-Interval #
In our software, the intervals of the long sections are typically based on the length of the pipes or drains.
However, in the case of designing a road project with drain reserves along the stretch, it is possible to customize the intervals to follow the chainage of the road design and accurately display the drains’ positions relative to the road platforms.
Steps: #
Options > Project Parameters > Drainage > Detailing > Long Section > X Detail Interval Level > OK
Outcome: #
Customizing Elevation-Level #
Furthermore, users have the option to modify the intervals of the elevation level which can help users in improving the depiction of elevation within the long section.
Steps: #
Options > Project Parameters > Drainage > Detailing > Long Section > Elevation Detail Interval Level > OK
Outcome: #
Are These Features Available For Other Modules? #
Certainly, this feature is accessible in the Earthwork Module, Road Module and all Utilities Modules which can be referred to here.
Also shown below is the example of the customization in the other modules.