Objective
- Comparison between software calculation and manual calculation. To ensure that the results are the same
- Software extract the correct value from Table in MSMA 2
Project Development details
Area: 1 ha (0.75 ha for impervious, 0.25 ha for pervious)
Terrain condition : Lowlying
MSMA 2nd Edition
OSD Sizing Procedure (MSMA 2 – Simplified Method) |
|
Manual Excel Spreadsheet | MiTS Software |
Design Criteria Design Manual: MSMA 2 Method: Simplified Method Type of OSD = Below Ground |
|
Proposed Development Location: Kuala Lumpur Region: Region 1 – West Coast Impervious = 0.8 ha ; Pervious = 0.2 ha Terrain = Lowlying |
|
3. Permissible Site Discharge (PSD) & Site Storage Requirement (SSR) | |
Table 5.A1 Interpolate; PSD = 65.3 l/s/ha SSR = 499 m3s
|
Table 5.A1 |
Table 5.A1
|
|
Table 5.A2 Interpolate: PSD : 62.1 l/s/ha SSR : 487.23 m3s Inlet : 196.67 l/s/ha |
Table 5.A2 |
Table 5.A2 |
|
4. OSD Tank Sizing | |
|
|
5. Inlet & Outlet Sizing | |
Table 5.A3 Table 5.A3; Interpolate Volume (m3) : 500 m3 Inlet & Overflow Dia. (mm): 510 mm Outlet Dia. (mm) : 195 mm Table 5.A4; Interpolate i) Determine the Overflow Pipe Diameter using Inlet Flow obtained from Table 5.A2 as discharge : 0.1967 m3/s Pipe diameter = 448 mm ii) Determine the Outlet Pipe Diameter using PSD value obtained from Table 5.A2 as discharge 0.0621 Pipe diameter = 294 mm |
Table 5.A3
|
Table 5.A3 |
|
Table 5.A4 |