by admin | Jul 16, 2018 | Blog, Technical Documentation
admin...
by admin | Dec 7, 2017 | Blog, MiTS 1, Technical Documentation
CLASH ANALYSIS Purpose : To check the clash between drainage, water reticulation and sewerage 1.0 Clash Analysis Make sure analysis of at least two of the networks has passed (drainage, water reticulation and sewerage) Image 1 Analysis for Drainage, Sewerage and Water...
by admin | Nov 1, 2017 | Blog, MiTS 1, Technical Documentation
There are some changes in MiTS 3 when it comes to the calculation of the verge slope ratio MiTS 1/MES Module: Road Go to: > Cross Section Detailing As shown above, the verge slope is 1:3.4. Go to: Options >> Parameters >> Analysis >> Design As stated above, the verge...