by admin | Dec 7, 2017 | Blog, MiTS 1, Technical Documentation
CLASH ANALYSIS Purpose : To check the clash between drainage, water reticulation and sewerage 1.0 Clash Analysis Make sure analysis of at least two of the networks has passed (drainage, water reticulation and sewerage) Image 1 Analysis for Drainage, Sewerage and Water...
by admin | Nov 1, 2017 | Blog, MiTS 1, Technical Documentation
Go to: >cross section detailing As shown above, the verge slope is 1:3.4. Go to: Options >> Parameters >> Analysis >> Design As stated above, the verge slope is at 25% which supposedly give out the ratio in the cross section detailing at verge of...