by Ngu Soon Hui | Jun 12, 2018 | Blog, Events
MES Innovation will hold a seminar on ‘Advanced Infrastructure Design Technology in Malaysia’ that will be kick off in this coming September. This seminar is a collaboration seminar with REDAC, USM. Details of the seminar are as follow: Date: 24th & 25th September...
by Ngu Soon Hui | Jun 12, 2018 | Blog, Events
MES Innovation will hold a seminar on ‘Advanced Infrastructure Design Technology in Malaysia’ that will be kick off in this coming July at Kuching Sarawak. This seminar is a collaboration seminar with Universiti Malaysia Sarawak (UNIMAS) and REDAC, USM. Details of the...
by Ngu Soon Hui | May 24, 2018 | Blog, MiTS 1, MiTS 2, MSMA
A high resolution of the SUStoM design manual can be found at...
by Ngu Soon Hui | May 22, 2018 | Announcements, Blog, MiTS 1, MiTS 2, MSMA
SUStoM stands for Sarawak Urban StormWater Management. It is a planning standard to incorporate stormwater management into the design in order to minimize environmental degradation and improve aesthetic as well as recreational appeal of areas in Sarawak. As a...
by Ngu Soon Hui | Apr 26, 2018 | Blog, MiTS 1, Troubleshooting/Tips
MiTS 1 Existing Road To change the gradient of carriageway, shoulder and verge of existing road, go to: Carriageway Super-elevation > Spread Input > Adjust Cross Slope Rate % value Shoulder Road Width > Adjust Shoulder Cross Slope,% in Properties tab on RHS...
by Ngu Soon Hui | Apr 26, 2018 | Blog, MiTS 1, Troubleshooting/Tips
For Slope Out, for cut / fill hatching, the slope will be generated starting from the ‘Platform level’ and will stop until it reaches Original Ground Level or Neighboring Platform Level or whichever comes first. For Slope in ( internal slope), the slope in between...