603 - 5885 1250 (4 lines) info@mes100.com

New Features 

  • Multiple tiers of retaining structure
  • MC Integrator plugin for Civil 3D 2021/2022 
  • Google Earth Import and Watershed Analysis to Estimate Flow Path
  • Watershed Delineation in 3D view
  • Provide checking on the imported area of survey points 
  • Preserve the platform elevations from the exported drawing from MiTS 
  • Termination height for retaining structure 
  • Superimposed google maps as an image at input 
  • Flow path is now available in 3D view 
  • Users are now able to import Z value when importing drain/sewer 
  • Reorientation of drainage direction following gravity flow with just one click 
  • Display values for surveyor points is now available 
  • Improvement in drainage and sewerage iteration engine
  • Superimposed of surveyor points and platforms on top of the watershed delineation 
  • New warning prompt user when temp folder is full and unable to save file because the project is locked 
  • API key will not be able to be copy over to different machine 
  • Drain volume is now available in the drain excel report 
  • User are now able to choose whether to check Qprimary outlet against Pre Development (Qp) or not for OSD Rational Method 
  • Soil properties per boundary basis (Swell/shrink factor) 
  • Google earth import ‘GPS’ major and minor axis is now at the input keyplan
  • PDF import for tracing 
  • Water demand unit change 
  • Match corner command in earthwork 
  • Define platform elevation levels entirely on point basis
  • Both sewerage and drainage can show drop on per pipe basis 
  • Preserve the platform elevations from the exported drawing from MiTS
  • User are now able to specify 3 points on a platform to auto break a platform 

Enhancements 

  • Minimum Time of Concentration (tc) Setting 
  • To allow contour line in watershed delineation
  • Different fire demand for different hydrant 
  • Tracing drawing now can be exported into .dwg format 
  • Prompt user to restart machine after updating MiTS 
  • MSMA progress is now save for every stage 
  • No more missing area when generate watershed delineation 
  • More refine and improve watershed delineation presentation 
  • MSMA 2 method is now on top of the list 
  • Road design speed in line mode now can be override manually 
  • Enabling edit button at the RHS property grid for multiple rows selection 
  • Suggestion message on road vertical alignment input has points that are not within the bounds of the string verification 
  • Usage of API and google earth elevation accuracy is now link to blogpost at the google earth import dialog 
  • OSD ‘Provided Depth of Water’ is now change to ‘Depth of OSD’ which including freeboard 
  • Warns user when there is no PE assign in sewerage design 
  • Warns user when there is no catchment assign in drainage design 
  • Message to prompt user to use suitable grid size when using google earth import to import points 
  • Failed sewer is now shown in calculation and long section 
  • User now able to manually set the C value for spillway at the sediment basin 
  • Clearer detailing for sediment basin 
  • User now able to configure setting for the gap space between the long section and the clash sign 
  • Invert level adjustments to all utilities (sewer, drain, water reticulation) by click ‘adjustment’ at spread input 
  • Polyline import generated from ACAD for drain flow direction 
  • OSD Swinburne Method, MSMA 2 table method and inflow hydrograph 
  • Inflow and outflow hydrograph for OSD MSMA 1 
  • Improvement error message for closed road on duplicating points 
  • Warning to prompt user regarding external drawing 

Bug fixes 

  • Fix on Warning on tc more than 5 minutes on Drainage 
  • Fix on Clash analysis marks are stacked up in the long section
  • Fix on Crash when generating drain long section
  • Fix on Road horizontal detailing table for Curve IP is missing’
  • Fix on Crash on batch cut section after changing the scale for End Area Method
  • Fix on Crash when undo grid system
  • Fix on Grid Element is not showing 
  • Fix on The origin point does not show after set on surveyor point dialog
  • Fix on When loading tracing file the origin is not preserve at the 0,0 coordinates at the point of selection
  • Fix on OSD with pump crash
  • Fix on 3D view export to .dwg in mm unit always 
  • Fix on warning on ‘sewer depth out of range’ when the depth is set within the range set in the parameter
  • Fix on to allow only selected IPs to be shown
  • Fix on crash when the storm duration is out of range 
  • Fix on error opening file when “Earthworks” is turned off
  • Fix on crash after batch export 3D view
  • Fix on to change the drain arrow style to single arrow with thicker line wight
  • Fix on allow warning message on “catchment and PE” when there is a drain/sewer
  • Fix on t is not reflected to Storm Duration 
  • Fix on error in creating roundabout
  • Fix on error opening project file
  • Fix on error in analyzing drainage 
  • Fix on warning message on “the defined z points on the platforms nearly a line…” should not appear
  • Fix on change minimum depth for backdrop to maximum depth for backdrop’ 
  • Fix on calculation error at pond sizing
  • Fix on Out of Velocity’ failure is not stated in Excel Report 
  • Fix on Maximum Gradient Allowed is not reflected 
  • Fix on MiTS crash when right click on elements that are not clashing on the keyplan
  • Fix on software becomes sluggish after batch export 3D view
  • Fix on software prompt user of “fixed drain height is larger..” warning for box drain
  • Fix on No verification error regarding ‘road vertical alignment input is not complete’ 
  • Fix on unable to import survey points 
  • Fix on streamline arrow size under watershed delineation is redundant’ 
  • Fix on user is now allow to change the coefficient description in pond rational method 
  • Fix on software lagging when input data for pond time area 
  • Fix on synched Earthwork platform to OSD rational method at the pond sizing showing incorrect values 
  • Fix on outlet design tab in OSD was greyed out when reopen the project file 
  • Fix on side slope ratio in pond sizing return back to default value when reopen the project file 
  • Fix on fix height for auto balance is not working 
  • Fix on sync Earthwork platform to pond at the pond sizing the values show 0m 
  • Fix on water pipes Invert Level is 0m after import
  • Fix on cannot analyse due to error on platforms was outside the convex hull 
  • Fix on cannot import Earthwork platform and MiTS will crashed 
  • Fix on platforms are not imported 
  • Fix on changes of slope parameters in Parameter setting should clear all the road platforms 
  • Fix on double click the pipe to change the direction flow, but the Invert Level is not reversed
  • Fix on table label in utility keyplan is not editable 

 

× WhatsApp Help