New features
- Allow deleting of surveyor points in 3D view
- CAD function is now available when import tracing drawing
- Slope classification for platform
- Users are allow to choose slope classification to follow project boundary
- Users are allow to choose either to show 2D surface area or 3D surface area in slope classification
- Import survey points with different units in one go
- Interface on deactivate/reactivate softlock license
- 3D view now can be exported as lidar file (.las)
- Thickness of drain is now shown in 3D view
- Parameter setting adjustment for cut/fill ration in batch for existing project
- Auto generate road chainage marks
Enhancements
- Faster loading tracing file
- Create slanting platform with more advanced features in MiTS 2
- Now in MSMA description of ‘Freeboard’ is implemented
- Nearest snap is now set as one of the snap default setting
- Allow analysis of MSMA Culvert to proceed even if the pipe dimension is not suitable
- Note added at the road end area report on cut fill volume is per road basis
- Remark on drain depth more than the maximum depth is now enhanced
- Peak flow method set as default
- ACAD shortcut is now available in MiTS 2.5
- The ‘cascading’ word is omitted in drain key plan if there are no cascading drain applied
- New tooltip for Wet Sediment Basin Table 12.19
- Fd will be 5 minutes if tc is less than 5 minutes for OSD MSMA 1
- Cut section/long section text should remain same size in all situation
- Chainage added for master string cut section in Earthwork
- Drainage arrow is now separated into one separate layer
- Platform match elevation with neighbouring platforms is now available
- Drain iteration has now been made optimum.
Bug fixes
- Fix on ‘change 0 for 2P24’ for Sabah and Sarawak to ‘All’
- Fix on ‘MITS 2.5’ number cannot be seen at the splash screen’
- Fix on ‘when select drain, the selection box is not shown’
- Fix on ‘shortcut keys for platform line input is not functioning’
- Fix on proposed H1 is too large even when iterate set to yes
- Fix on software should propose suitable slope to make the drain velocity pass the minimum velocity set in the parameter
- Fix on software crash when click vertical alignment in road
- Fix on middle mouse is not working in 3D
- Fix on survey points select button is not highlighted when it is activated
- Fix on Civil 3D cannot sync to MiTS 2
- Fix on measurement CAD are not working
- Fix on drain network need to be exploded first in CAD to properly import in MiTS
- Fix slope stops before it reached the ground level
- Fix on when selecting survey points at input screen some of the row at the spread input are not selected
- Fix on fill volume in End Area method is not calculated using End Area equation
- Fix on to separate non related column in pond routing table
- Fix on values of ST and TS are missing from Road Horizontal Detailing plan
- Fix on missing user defined for catchment area at drain RHS property grid
- Fix on storage well dimension is missing
- Fix on diameter size between spread input and RHS property tab are not tally
- Fix on to remove dropdown button for location at the RHS property grid
- Fix on pipe type changes is not updated in the input screen
- Fix on crash when the end chainage of road width is less than the road length
- Fix on the input road width is not updated if the chainage is more than the end chainage
- Fix on invalid gradient category
- Fix on cut section hatch scale is not updated
- Fix on rendering selection of entities are not the same as previous version
- Fix on blank screen appear after overwrite an existing project with the same name
- Fix on text height is not reflected in road vertical detailing
- Fix on crash when the second survey points group is deleted
- Fix on program crash when export appendix for culvert design
- Fix on MSMA tab is not closed when opening other modules
- Fix on crash when closing the project parameter settings
- Fix on no saving the project message after changing the snap object settings
- Fix on MiTS exits when opening the project
- Fix on ‘Supported File’ cannot detect VDCL file from the project folder
- Fix on report above tab (printing,zoom) is not fully shown
- Fix on Secondary Q for pond time area is editable
- Fix on Q2 minor design flow is not generated if it is synced with drain
- Fix on Screen scroll/down as the raingauge location map is zoomed in/out
- Fix on renumbering function in drain not working
- Fix on blank drainage textual report
- Fix on warning message of Analysis Successful on water reticulation