603 - 5885 1250 (4 lines) info@mes100.com

Reorder Slope

Reorder slope is used when (1) the platform is set to Slope In and (2) the platform level is lower than the ground level. It is used to “reverse” the slope direction so that full berm will be located at the bottom part. An example is as below Issue: Full...

Slope Modeling Techniques in MiTS

Question 1: How to set the slope direction for platforms? In MiTS, newly imported or created platforms are initially set with a default slope direction of “Out”. Users have the flexibility to redefine the slope direction for each platform edge, choosing between “Out”,...

Previous Slope Feature

What is ‘previous slope’?  It is a feature implemented to allow the user to enable the ‘previous slope’ when there are amendments and requires more modeling work. When a user makes some changes to the modeling, the slopes generated previously will be erased (...