603 - 5885 1250 (4 lines) info@mes100.com

MiTS 2

  • Full 3D integrated design across all modules in one single user interface.
  • Google Earth point & elevation imports
  • Auto pick up OGL, PL & slope level
  • Real-time verification
  • Improve working speed by 80% over the previous version
  • Better visualization, more accurate design & enjoys better coordination
  • Clash analysis between Water, Sewer & Drain in 3D
  • View & edit directly entity clash in 3D
ANNOUNCING MiTS 2.10

Dear MiTS users, for any technical inquiries or issues, you may reach out to us via email or WhatsApp.

Please be informed that the operation hours for the Technical Team during Ramadhan will be from Monday to Friday, 8.30am to 4.30pm.

USING MITS TO DESIGN STANDARD-COMPLIANCE INFRASITES

Road– urban or rural– design can be a tricky subject to get right, despite the simplistic appearance. The engineers have to consider multiple factors such as guideline compliance (REAM, ATJ 2015 or to some extent, AASHTO), cost consideration, soil condition and the impact on the ecosystem. The designed road must be pleasing to drive at, it must not disturbed..

STEP BY STEP TO RESOLVING EARTHWORK QUANTITY DISPUTES WITH CLIENT

How do you resolve earthwork quantity disputes?

Anonymous

Frequently we receive such inquiries from our users. Often when our users– who are consultants– present their earthwork quantity results,  their clients would come up with an alternative figure. Often, the clients will just present a single number, with no..

ADDING VALUES TO YOUR CLIENTS

How do you differentiate yourself as a consulting engineer?

With more and more civil engineers entering the workforce–one estimate is that around 16K new graduates are produced yearly (about 50% of them are civil engineers), and with more and more engineering firms set.. 

CASE STUDY: WHEN YOUR EARTHWORK CUT AND FILL RESULT IS CHALLENGED...

Imagine in a meeting, you just happily present the output of MiTS software for the infrastructure design. You show the earthwork levels you design, the keyplans, the drainage longitudinal cross section, the predevelopment watershed analysis and the 3D view to your client, architects, other fellow engineers and quantity surveyors. It seems that everyone is extremely engaged and towards the end, it looks like you are making the greatest…

WATERSHED CASE STUDY

Watershed is the area where the flows from higher point drains all the water running to a common outlet. It combines with other watersheds forming network of stream that all drain into larger body of water, such as lakes and oceans. Topography..

HOW MiTS HELPS PRESTASI PERINTIS

As professional engineers, we all want our civil works design to be  professional– safe and developed within a reasonable budget. We also want to produce our design fast so that we can make a good impression with our ever demanding clients.

And on top of it, we want to ensure that our team– regardless of how junior they are– can be as productive and as diligent as the most senior person.

Therefore…

OPTIMIZING MITS PERFORMANCE FOR A MEGA ROAD PROJECT WITH 800,000+ SURVEY DATA

Handling long stretches of rural road projects can be quite a challenge. The engineers could be receiving ground-level information in the form of hundreds of thousands if not millions of survey points–courtesy of LIDAR data or data from Google Earth import– from the surveyors. And on top of that the engineers will have to design a long stretch of roads ranging from 20 km, which could result in many tens of thousands of platforms (or mesh triangles).

Such a heavy drawing can easily buckle the…

Read latest blogrolls!

Remote Support

Team Viewer

Training

× WhatsApp Help